Winnable

Open tenders / Transport & taxis

Planned procurement · Notice 094194-2026

OLE Monitoring for Class 730

WM Trains Limited

Value
Value not stated
Stage
Early notice
Where
North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
1 Jan 2027 – 31 Dec 2031

In plain English

WM Trains Ltd is running preliminary market engagement (not open for bids yet) on supplying six overhead line monitoring systems, with cameras, wireless sensors, a software subscription and design documents, for its Class 730/0 trains, with a contract period of 1 January 2027 to 31 December 2031. If no supplier can link in with its existing Class 350 monitoring system, it intends to award the work directly without a competition.

Good fit for: Rail technology firms that make overhead line camera and sensor monitoring systems and can link them to the existing Class 350 monitoring database.

The catch (with the notice's own words):
  • Must feed into existing Class 350 database All data generated by the Class 730 OLE systems must integrate fully and directly into the existing Class 350 OLE monitoring database.
  • Direct award likely if no compatible rival WM Trains intends to formalise a direct award pursuant to Schedule 5, Paragraph 7 of the Procurement Act 2023
  • Must use 5G data transfer The solution must enable remote collection, processing, high-speed transfer, and review of dynamic OLE monitoring data utilising 5G capability.
  • Data jointly owned by WM Trains and Network Rail must be jointly and unreservedly owned by WM Trains Ltd and Network Rail, with unrestricted sharing rights for designated maintainers.

Written with AI. Always bid from the official notice.

What the buyer says

General Information & Purpose of Engagement WM Trains Ltd is undertaking this Preliminary Market Engagement (PME) in accordance with the Procurement Act 2023 to engage the market regarding the supply and deployment of Overhead Line Equipment (OLE) Remote Condition Monitoring (RCM) systems across its Class 730/0 fleet. WM Trains currently operates eight OLE monitoring systems fitted to its Class 350 fleet, delivered via Transmission Dynamics and funded through an asset owner initiative with Angel. This legacy deployment relies on an established, proprietary front-end user interface and database accessed collaboratively by WM Trains, Network Rail, and fleet maintainers to safeguard infrastructure and maintain operational continuity. To enhance the coverage of its electrified routes, WM Trains requires an additional six monitoring systems for the Class 730/0 fleet. WM Trains considers that procuring an alternative, non-integrated solution would create fragmented operational dashboards, split data streams, and cause disproportionate technical difficulties in maintenance and real-time operations. Consequently, the core purpose of this PME is to directly test the market to establish whether any economic operator can realistically deliver the required functionality and integrate seamlessly with the existing proprietary setup without introducing disproportionate technical and operational difficulties. If the market engagement confirms that no compatible alternative can achieve this integration, WM Trains intends to formalise a direct award pursuant to Schedule 5, Paragraph 7 of the Procurement Act 2023 (Section 41 - Direct award in special cases: Additional or repeat goods, services or works). Key Scope Overview & Technical Constraints The planned requirement is strictly for th…

What happens next

This is an early notice: the buyer is planning a tender, and its documents come when the tender is published. Read the official notice for the details.

Procedure: not stated. Published 6 Oct 2026.

Similar open tenders

Want tenders like this, matched to your firm?

Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial (no card needed).

Start free trial