Open tenders / Architecture, engineering & surveying
Planned procurement · Notice 084427-2026
SF6 Leak Repair Framework
National Grid Electricity Transmission PLC
- Value
- £7.5m
- Stage
- Early notice
- Where
- London
- Lots
- 1
- Suitable for SMEs
- Not stated
- Contract
- 31 May 2027 – 31 May 2030
Framework: winning a place puts you on an approved list for future work. It's the entry ticket, not guaranteed work.
In plain English
National Grid wants contractors to repair, reduce and prevent SF6 gas leaks on gas-insulated switchgear and busbars at transmission substations across Great Britain. Work covers design, installation, testing and inspection of external, non-intrusive repairs, usually with equipment still live; the list of approved suppliers runs 31 May 2027 to 31 May 2030, with possible 2-year extension, worth around £7.5m.
Good fit for: Specialist high-voltage substation repair and SF6 gas containment contractors.
Watch out: Must operate an ISO 9001-compliant quality management system; Must act as Principal Contractor and Principal Designer under CDM 2015; Repairs typically carried out without taking equipment out of service, so live-working competence is needed; Single lot covering the whole GB transmission network
Written with AI from the official notice. Check the notice before relying on it.
What the buyer says
National Grid Electricity Transmission (NGET) intends to establish a framework for the provision of Sulphur Hexafluoride (SF6) leak repair, leak reduction and preventative treatment services across its portfolio of Gas Insulated Switchgear (GIS) and Gas Insulated Busbar (GIB) assets located at transmission substations throughout Great Britain. The framework is intended to increase the delivery of SF6 emissions reduction activities through the use of standardised contracting arrangements and approved repair methodologies. Appointed contractors will be responsible for the design, installation, testing, inspection and quality assurance of external, non-intrusive repair solutions that maintain asset integrity and operational performance while reducing or preventing SF6 leakage. Solutions may include permanent repairs, leak-rate reduction treatments, and preventative interventions, and will typically be required to be installed without taking equipment out of service where reasonably practicable. Contractors will be expected to provide technically robust, evidence-based solutions, operate under ISO 9001-compliant quality management systems, and fulfil the roles of Principal Contractor and Principal Designer under the Construction (Design and Management) Regulations 2015. The framework will enable NGET to respond efficiently to emerging SF6 emission reduction requirements across its transmission network. The anticipated term of the framework will be a 3-year initial term with 2 year extension options upon mutual agreement.
Procedure: Competitive flexible procedure. Published 7 Sep 2026.
Similar open tenders
- Traffic Speed Condition Survey 2027 - 2032 (TRACS6) - UK1 Pipeline Notice · National Highways Limited · closes 25 Sep
- Masterplan Feasibilities External Project Manager · Science Museum Group · closes 28 Sep
- Herring and Haven Bridge · Norfolk County Council · closes 28 Sep
- Safety Officers for the Helipad · St George's University Hospitals NHS Foundation Trust · closes 28 Sep
- Inner Moray Firth Housing & Property Maintenance Framework - 2026 · Highland Council · closes 28 Sep
Want tenders like this, matched to your firm?
Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial.