Winnable

Open tenders / Construction & civil works

Open tender · Notice 084883-2026

Public Footpath Surface Works - Harris Park Extension

Cockermouth Town Council

Value
Value not stated
Closes
16 Oct 2026 (22 days)
Where
North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
1 Feb 2027 – 15 Feb 2027

What the buyer says

1.1 The Authority Cockermouth Town Council is inviting competitive tenders for minor civil works to improve a public footpath section. Engineering drawings and technical specifications were prepared on behalf of the Town Council by Cumberland Council. 1.2 Purpose of Work The objective is to establish an accessible, surfaced route from Double Mills footbridge to the woodland section behind Dale View, Cockermouth. Currently, this missing link prevents access for pushchairs, wheelchairs, and less-mobile pedestrians. 1.3 Key Project Details • Design & Standards: Formulated via engineering drawings provided by Cumberland Council. • Target Start Date: February / March 2027 (Spring 2027) or before. • Contract Duration: Estimated 2 consecutive weeks. 2.1 Scope of Works The contractor will provide all plant, labour, and materials to execute the following sequence: 1. Site Establishment: Set up a secure temporary compound near the park entrance at Dale View. 2. Safety Measures: Formally close Footpath No. 223015 to the public for the 2-week duration of works. (Cumberland Council has agreed to meet the costs of this) 3. Excavation: Dig out a ground tray 50mm deep along the path alignment. Retain topsoil and arisings on-site for reuse. 4. Membrane: Supply and lay a heavy-duty geotextile separation membrane along the length of construction. 5. Sub-Base: Supply, lay, and compact a 150mm depth of Type 1 granular sub-base. 6. Surface Course: Supply, lay, and compact a 40mm depth of 0-6mm crushed aggregate to form a smooth, accessible top finish. 7. Alignment Note: The path alignment must run to the right-hand side of the park bench and to the left-hand side of the trees. 8. Tie-ins: Saw cut the existing macadam path at chainage 0m near the Double Mills footbridge to ensure a flush fini…

Procedure: Below threshold - open competition. Published 8 Sep 2026.

Similar open tenders

Want tenders like this, matched to your firm?

Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial.

Start free trial