Winnable

Open tenders / Architecture, engineering & surveying

Planned procurement · Notice 085686-2026

DC1 Solar Wall Principal Contractor

Natural History Museum

Value
£950k
Stage
Early notice
Where
London
Lots
1
Suitable for SMEs
Not stated
Contract
2 Nov 2026 – 29 Jul 2027

In plain English

The Natural History Museum wants one main contractor with specialist façade skills to design, make and install a replacement for the failed glass 'Solar Wall' on the Darwin Centre Phase 1 building in South Kensington, on a design-and-build basis. Work runs from early November 2026 to late July 2027, with an estimated value of £950,000.

Good fit for: Specialist façade, cladding and glazing contractors able to act as principal contractor on a design-and-build job.

Watch out: Contractor must be 'suitably qualified and experienced' with specialist façade design capability; Must take on principal contractor duties, including all management, supervision and coordination; Work is on a live, publicly visible museum estate building

Written with AI from the official notice. Check the notice before relying on it.

What the buyer says

The Museum is undertaking a procurement process to appoint a suitably qualified and experienced Principal Contractor with specialist façade expertise on a Design and Build basis for the design, engineering, procurement, manufacture, installation and completion of the works associated with the upgrade and replacement of the DC1 Glass Solar Wall within the Museum estate. The Contractor shall provide all resources, specialist façade design input, management, supervision and coordination necessary to deliver the works in accordance with the Contract, detailed performance specification and Employer’s Requirements. The Darwin Centre Phase 1 (DC1) is a prominent building in the Museum complex visible from Queens Gate in South Kensington and overlooking the newly created and award winning UNP gardens. The replacement of this façade will enable this section of the site to be returned to operational functionality and integrated back into full use. An investigative study was commissioned by the Museum following the failure of three glass panels on the South Facing ‘Solar Wall’ elevation of the DC1. The solar wall was installed in 2002, and the secondary components within façade systems such as these usually have an expected service life of 25 years if correctly maintained.

Procedure: not stated. Published 10 Sep 2026.

Similar open tenders

Want tenders like this, matched to your firm?

Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial.

Start free trial