Winnable

Open tenders / Construction & civil works

Planned procurement · Notice 089214-2026

Wemyss Metal Mine Works

Mining Remediation Authority

Value
Value not stated
Stage
Early notice
Where
Wales
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
1 Jun 2027 – 31 Aug 2028

In plain English

The Mining Remediation Authority wants construction works at Wemyss metal mine in Wales to control water flows: a new storage/attenuation pond with raised bund and flow controls, a bypass channel around a collapse feature, highway drainage and filter drain, and a new lined water channel with flow monitors plus ford crossings. Works are scheduled from June 2027 to August 2028 as part of the Wales Metal Mine Programme.

Good fit for: Civil engineering or groundworks contractors experienced in watercourse, drainage and earthworks projects.

Written with AI from the official notice. Check the notice before relying on it.

What the buyer says

These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority. This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales). This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework Directive) (England and Wales) Regulations 2017). Works – Summer 2027 • Introduction of an Upper Storage/Attenuation Pond to reduce flows into Upper Mill Race Stream. This will include increasing the existing bund height and installing flow control infrastructure. Approx length 90 metres and approx. height 1.5 metres. • Bypass the circular collapse feature east of Glanville’s Shaft with new open channel. • Introduction of highway drainage system and filter drain to avoid runoff finding its way into the main spoil tip. • A new lined water channel with flow monitors from the public highway to the Nant Cwmnewydion, construing a new ford crossing and improving the existing ford crossing. Approx. length 95 metres.

Procedure: not stated. Published 21 Sep 2026.

Similar open tenders

Want tenders like this, matched to your firm?

Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial.