Open tender · Notice 089825-2026

HAR6096 Bradwell Street Garages Development - New Housing Development Scheme

Tower Hamlets

Value
£4.2m
Closes
6 Nov 2026 (43 days)
Where
London
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
1 Feb 2027 – 1 Aug 2028

In plain English

Tower Hamlets Council wants a builder to construct seven new four-bedroom family homes, including one wheelchair-accessible home, on the former garage site at Bradwell Street, Bethnal Green (E1 4BY). Work is expected to run roughly 18 months from February 2027, with a further 12-month defects period after completion.

Good fit for: Small to mid-sized main contractors experienced in residential new build on tight urban sites.

Watch out: Tight infill site next to a Network Rail line, with building-next-to-public-assets risks to manage; Homes must be built to Passivhaus principles (not formally accredited); One home must meet M4(3) wheelchair-accessible standards; Contractor stays on the hook for 12 months of defects after practical completion

Written with AI from the official notice. Check the notice before relying on it.

What the buyer says

Site Location: Former Bradwell Street Garage site, London, E1 4BY, Bethnal Green East ward. The development of this new housing scheme directly supports the Council’s strategic priority to increase the supply of affordable homes within the borough and address the growing challenges of homelessness and overcrowding. It aligns with the Council’s new 10-year Housing Strategy, More Homes. Better Homes. Safer Homes, which outlines the ambition to deliver high-quality homes for local residents. With over 30,000 households currently on the Council’s housing register, many families face significant difficulties in securing homes that are safe, secure, and suitable for their needs. The Bradwell Street development will deliver seven intentionally designed large family homes, all comprising four bedrooms. This includes one 4-bedroom, 8-person M4(3) wheelchair-accessible home, specifically designed to meet the needs of residents identified through Project 120—Tower Hamlets’ initiative supporting the borough’s most acutely disabled families. This purpose-built scheme places residents at the centre of the design process, ensuring that the needs of end users are fully considered and incorporated. The development has been designed in accordance with non-accredited Passivhaus principles, promoting enhanced energy efficiency and sustainability. The site is located adjacent to Network Rail on a constrained infill plot. The proposed construction programme reflects the challenges associated with Build Adjacent to Public Assets (BAPA) risks, with an estimated duration of approximately 18 months from groundbreaking to practical completion. The main works contract is expected to remain in place for a further 12 months post–practical completion to cover the defects liability period.

Procedure: Below threshold - open competition. Published 22 Sep 2026.