Open tenders / Construction & civil works
Planned procurement · Notice 092991-2026
Pipeline Notice - A27 Arundel Railway Bridge Replacement
- Value
- Value not stated
- Stage
- Early notice
- Where
- UK-wide
- Lots
- 1
- Suitable for SMEs
- Not stated
- Contract
- 14 Jun 2030 – 30 Jun 2033
In plain English
National Highways is preparing to replace the A27 Arundel Railway Bridge, with the work expected to run from 14 June 2030 to 30 June 2033. This is a pipeline notice, so it's not open for bids yet; it's a heads-up that a design and build partner will be sought in future.
Good fit for: Civil engineering and infrastructure contractors experienced in design and build road/rail bridge projects.
Written with AI from the official notice. Check the notice before relying on it.
What the buyer says
The A27 Arundel Railway Bridge Replacement Scheme will replace the existing railway bridge structure to improve its condition, resilience and long-term performance on this key section of the A27. The project aims to maintain a safe and reliable route for road users while minimising future maintenance requirements and disruption to the strategic road network. National Highways will be looking to procure a design and build partner to deliver the A27 Arundel Railway Bridge Replacement scheme.
Procedure: not stated. Published 1 Oct 2026.
Similar open tenders
- Design and Installation of a 9-Hole Crazy Golf Course · Langar cum Barnstone Parish Coucil · closes 17 Oct
- Sutton Seeds Roundabout Bus Priority · Wokingham Borough Council · closes 18 Oct
- WMH ED X-Ray Rooms 1 and 2 · Betsi Cadwaladr University Health Board · closes 19 Oct
- Teddington Allotments Reclamation Works at Shacklegate Lane Cemetery · London Borough of Richmond upon Thames · closes 19 Oct
- Strategic Flood Risk Assessments Level 1 and 2 · East Suffolk Council · closes 19 Oct
Want tenders like this, matched to your firm?
Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial (card needed to start, nothing charged during it).