Winnable

Open tenders / Construction & civil works

Open tender · Notice 0a92843d-9da8-4c16-b682-33b5d72727db

SZC CWA - Pool Bunker Construction

Sizewell C Limited

Value
£20m
Closes
25 Nov 2026 (4 days)
Where
London
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
6 May 2027 – 31 Oct 2028

In plain English

Sizewell C Limited wants a contractor to design to RIBA stage 4, build and commission a Pool Bunker above the base slab at its nuclear power station project, estimated at £20,000,000. The building will be used to assemble, weld and inspect pool and tank liner modules, with handover targeted for 28 February 2028 and a stated contract period from 6 May 2027 to 31 October 2028.

Good fit for: Large main contractors able to design and build industrial steel-framed buildings with cranes, hoists and building services on major construction sites.

Written with AI. Always bid from the official notice.

What the buyer says

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review. The timescales are as follows: …

Getting the documents

competefor.co.uk (the buyer's e-tendering site, usually free to register).

Procedure: not stated. Published 19 Nov 2026.

Want tenders like this, matched to your firm?

Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial (no card needed).

Start free trial