Planned procurement · Notice 091618-2026

Strategic Charging Infrastructure Scheme

National Highways Limited

Value
£158.3m
Stage
Early notice
Where
North East, North West, East Midlands, West Midlands, East of England, South East, South West
Lots
1
Suitable for SMEs
Yes, says the buyer
Contract
1 Jul 2027 – 31 May 2028

In plain English

National Highways, working with the Office for Zero Emission Vehicles, is preparing the Strategic Charging Infrastructure Scheme to strengthen electricity network capacity at selected motorway service areas in England, enabling open-access EV charging; an indicative £190 million has been allocated, with an estimated contract value of £158,333,333 running from July 2027 to May 2028. This is a pre-market engagement notice seeking supplier feedback on delivery, packaging and commercial approaches, not a live tender; it closes on 30 October 2026.

Good fit for: Larger electrical infrastructure, grid connection and civil engineering contractors with experience in high-value energy or highways projects

The catch:
  • This is pre-market engagement only - no formal tender yet
  • Very high estimated contract value (£158 million+), likely to favour large firms or consortia
  • Enabling civils works (land preparation, substation housing) may be included, requiring broad capability
  • Procedure, lotting and deadlines not yet finalised - feedback will shape the future procurement approach

Written with AI. Always bid from the official notice.

What the buyer says

National Highways is working in collaboration with the Office for Zero Emission Vehicles (OZEV), a joint unit between the Department for Transport and the Department for Energy Security and Net Zero, to strengthen electricity network capacity to selected motorway service areas (MSA) in England through the Strategic Charging Infrastructure (SCI) Scheme. The transition to zero-emission vehicles is expected to drive significant growth in demand for electric vehicle (EV) charging at MSAs. This will require a visible and functional charging network across the motorway network to support current and future EV drivers and provide confidence when undertaking long-distance journeys. However, at several locations, the deployment of charging infrastructure is constrained by the existing electricity network capacity. In some cases, the cost of grid upgrades to meet future demand is not commercially viable for industry and represents a key barrier to the provision of additional EV charging infrastructure. The SCI Scheme will support the development of a strong open-access (can be used with any EV vehicle regardless of manufacturer) EV charging network across the motorway network by strengthening electricity network infrastructure to selected MSAs where investment is not commercially viable. The resulting network capacity will then be available to firms installing EV charging at the site at a subsided and commercially viable price. An indicative allocation of £190 million has been made for the scheme. Enabling civils works, such as land preparation and substation housing, to ensure all funded sites meet a minimum standard at adoption and connection stage, may also be within scope of the packages where required. Further details are provided within a separate scope document that can b…

What happens next

This is an early notice: the buyer is planning a tender, and its documents come when the tender is published. Read the official notice for the details.

Procedure: not stated. Published 28 Sep 2026.