- Value
- £40k
- Closes
- 27 Nov 2026 (6 days)
- Where
- Scotland
- Lots
- 1
- Suitable for SMEs
- Yes, says the buyer
- Contract
- 8 Dec 2026 – 31 Jan 2027
In plain English
Northern Lighthouse Board wants a 40,000-hour major overhaul of the starboard forward engine on its vessel NLV Pharos, with the work done on board and joining and leaving the ship on the east coast of Scotland. The notice says service works are expected from 4 January 2027 to 20 January, and the estimated value is £40,000.
Good fit for: Marine engineering firms experienced in servicing Wärtsilä L20 diesel engines on ships.
- Needs an experienced engine contractor
required to be overhauled by an experienced contract in January 2027
- Short, fixed work window in January 2027
Service works – Expected to be between 4th January 2027 and completion by 20th January 2026.
Written with AI. Always bid from the official notice.
What the buyer says
Northern Lighthouse Board (NLB) have a requirement for an engine overhaul, their starboard fwd engine, on board the NLV Pharos. NLV Pharos is a DP(AA) Buoy Tender, with a diesel electric power plant consisting of five Wärtsilä L20 Marine Engines. Three engines are 1440kW rated 8L20, with the remaining two being 720kW rated 4L20, one of which (Starboard FWD) being the subject of the following scope. This engine now requires a 40,000 hour major service, which is required to be overhauled by an experienced contract in January 2027. Brief scope of works: 1.Preparatory & Ancillary Component Work •Cylinder Heads: Prior to the installation of NLB-supplied reconditioned heads, replace the following items: rocker arm screws, yoke & adjusting nuts, and injection valve yoke tension screws. •Fuel Equipment (Pre-Service / Ship's Staff): Fuel pumps and injectors will be removed by ship's staff prior to the Supplier’s arrival. Fuel pumps will be sent ashore for overhaul by a third party, and injectors will be overhauled by ship's staff. These components are scheduled to be back onboard and ready for reinstallation by the Supplier during the service period. •Valves & Governor Components 2.Power Assembly & Mechanical Overhaul (Units 1–4) •Bottom-End & Crankshaft: •Pistons & Liners •Main Bearings: 3.Pump & Ancillary Overhaul •Strip, clean, and fit new consumable parts to the ship’s pumps •Thermostats •LO Cooler •Exhaust 4.Reassembly, Measurements & Testing •Reassembly & Adjustments – overhauled injectors and fuel pumps •Required Measurements (Wärtsilä Record Sheets) •Commissioning & Trials All spare parts and consumables will be supplied by NLB for the overhaul. Fuel details of all the above scope of works will be given in the full quote documents. Estimated timeline Quotation to be pub…
Getting the documents
nlb.delta-esourcing.com (the buyer's e-tendering site, usually free to register).
Procedure: Below threshold - open competition (Open: anyone can bid (a lower-value contract with lighter rules)). Published 13 Nov 2026.
Similar open tenders
- Provision of UPS - MEICA-UPS-01 · Bip Solutions Limited · closes 25 Nov
- Supply of Five x New Full Electric Small Vans · North East Lincolnshire Borough Council · closes 26 Nov
- Supply, Maintenance and Management of Tyres · Leeds City Council · closes 27 Nov
- Mission Feasibility Studies – Spacecraft Life Extension Service Demonstration · Department for Science, Innovation & Technology · closes 27 Nov
- In-Orbit Manufacturing (IOM) Maturation Research & Development Projects · Department for Science, Innovation & Technology · closes 27 Nov
Want tenders like this, matched to your firm?
Winnable emails the few new tenders that fit you each weekday, with the catch spelled out. £29/month after a 14-day free trial (no card needed).